Having worked through the presentation you downloaded from the link directly above,
can you see that improvement projects are triggered in the Service Strategy ITIL lifecycle phase?
The above said, ultimately it is all about you being able to "Up" your Productivity and Quality Stats
(while reducing Risk, Rework and Waste)
This goal is achieved by firming up CM Level 2 processes.
Do this for Traditional Project Management processes or
Agile processes.
Then, with
a managed CM Level 2 base
firmly in place; reach higher.
Connect the dots here to see touchpoints on your journey towards success.
Hover your mouse over the Deming image above.
CM Level 2+, differentiated from CM L1 per the CM table below, is all about Process Focus for Productivity and Quality improvements; as opposed to "just do it now" - heroics. Deming's philosophy above is the wisdom behind much of the Capability Maturity Model integrated from Carnegie Mellon University summarized (for Software Development processes) in the table below.
Click here for Dr. Deming's Red Bead Experiment.
This is an essential concept to learn if you aim for higher levels of Productivity and Quality and to be agile and lean.
I.e. can you pin down where is your game is currently at?
At 1000 feet up, looking down, all projects follow the same essential approach illustrated below
Remember that a project, stage, phase or iteration should all qualify to fall under this definition of what is a project? It's a temporary endeavor undertaken to create a unique product, service or result. A project is temporary in that it has a defined beginning and end in time, and therefore defined scope and resources. ELSE, not monitoring controls, you are out of control!
In Agile (Scrum project method for example) the goal is to produce working softare regularly each sprint that meets the user requirement (the art of slicing sprint delivery / product increment production). Requirements are accepted by the team as user stories into the current sprint. Therefore the gap in Scrum typically, is a 2 week sprint!
Here are some important questions you may want to consider, if your aim is to operate with agility at Capability Maturity Level 2+:
I.e. From the Agile Manifesto's two key principles which state:
“Our highest priority is to satisfy the customer through early and continuous delivery of valuable software”
Note: As the Scrum method can be used for all types of projects (not just software projects)
Per the last 10 minutes of the discussion here it is suggested that the word "software" can easily be swopped out for the word "value"
I.e. (in the Agile Manifesto's four value propositions:
We are uncovering better ways of developing software by doing it and helping others do it.
Through this work we have come to value:...)
PMBOK |
Standards |
Strategy
|
CMmodel |
CMMiDev
PPTtriad |
Vmodel |
ITIL
|
DevOps |
Prince2A
|
DSDM
Scrum |
SAFe
|
PCMM |
Cobit |
PDCA
Click presentation above for a high level overview and (if interested)
dive into the problems discussed below and solve them
I.e. No SMART requirements identified and no accurate planning and monitoring and control, rather extolling and pushing (driving heroic "just do it" behavior) to get more out of (trying to pull results) from the system than is possible (for resources / time allocated / clarity about requirements in respect of complicated solutions required). This lack of clear and agreed REQUIREMENTS (REQM) and insufficient / inaccurate PROJECT PLANNING (PP) and PROJECT MONITORING AND CONTROL (PMC) means the team are operating at Capability Maturity Level 1.
The book Accelerate refers to the Westrum Typology of Organizational Culture.
Accelerate (and ITIL etc.) state that Generative behavior on the right of the model is required for success in Agile and DevOps.
ITIL 4 calls this a "safety culture." The "safety culture" is needed for teams to align for agility and find solutions which approach may not be understood or tolerated in the Bureucratic and Pathelogical Organizational Cultures of the model.
I.e. With Westrum in mind, Where would you pin your Oranizational Culture to be at? Pathalogical, Bureaucratic or Open Minded and Generative.
Along with SMART REQM's: Find the CML2 processes Project Planning (PP) and Project Monitoring and Control (PMC)
Then
it's simply
ONE TWO THREE
Click here for the 7 Scrum dysfunctions (and using Root Cause Analysis (picking out the red beads explained below) etc.) give an idea of how to improve quality in the scrum (agile) project management system
- from Mastering Professional Scrum (2019) by Stephanie Ockerman and Simon Reindl.
Note: Some links in this download are dependant on pmway.hopto.org being up. I.e. see i on menu above.
Run optimally a scrum team should be able to release working software in a 2 week sprint. Then (demo's approved by the Product Owner) they (the willing workers) have succeeded and the goals for the team are reset during next sprint planning ceremony. Scrum Master's role is to ensure a safety culture, productive team, process improvement from CM L2 (and CML2+ where possible) and good governance!
Note that Traditional Project Management (TPM)'s 24 planning processes (just under half of the total processes for the PMBOK are planning processes!) are replaced in Agile Project Management (APM) / Scrum by User Stories! These must be approved as delivered each sprint by the Product Owner or the team are operating at Capability Maturity Level 1. And the minute a sprint is approved the team have finished that race successfully (they are operating at CM LEvel 2+)!
Deming's Red Bead Experiment goes a long way to clearly illustrate the causes and solutions for the "monkey trap" problem above.
Find this experiment on YouTube (or watch a PMWay selected video from YouTube below). Deming is the father of the Capability Maturity Model (CMMi) we are using here which is the output of the Software Engineering Institute at Carnegie Mellon University.
I.e. install scrum (or other TPM or APM) processes (DevOps etc., processes) that allow the method to operate correctly /
remove noise and obstacles (exhortations etc.) that is getting in the way.
and EAT (Executive Action Team) the Red Beads!
Time to up your game stats?
The Capability Maturity model above is a simplified version of the one found here
Finally (just for fun) click the red pin now if you want to do the Capability Maturity self assessment.